The best Side of Outdoor security lighting installer
The MCBs really should be clipped onto the Din bar and the busbar right into a present-day flowing terminal and limited screwed to offer current on the MCBs.Two sixteen/25mm tail cables, 1 neutral and the opposite active are connected to the primary double pole switch with the meter. The key earth cable need to be screwed to the earth block, and Th